Technical Reference

Global Grid Code Compliance Guide — 17 Countries

Free for engineers. No sales. No spam. Just engineering.

What is the Codigo de Red?

The Codigo de Red (Grid Code) is Mexico's mandatory power quality standard, established under MR CONE DOF 31-dic-2021, enforced by the CRE (Comision Reguladora de Energia). It defines the technical requirements that all grid-connected users must meet to maintain power quality and system stability.

It applies to: Medium Tension users with demand >= 1 MW and all High Tension (Alta Tension) users. For MT users under 1 MW, only voltage and current unbalance limits apply.

April 2026: Power Factor requirement tightens from 0.95 to 0.97

Starting April 2026, the minimum acceptable power factor increases from 0.95 to 0.97. Plants that are marginally compliant today will likely fall out of compliance. This is not a monthly average — it is measured every 5 minutes.

Compliance Parameters

Seven parameters define Grid Code compliance. All must be monitored continuously with Class A instrumentation.

Parameter Limit Measurement Compliance
Power Factor 0.95-1.0 (0.97 from Apr 2026) 5-min intervals 95% of readings
Voltage Unbalance ≤2% 10-min aggregation P95 weekly
Current Unbalance ≤15% 10-min aggregation P95 weekly
THD (DATD) 5-20% (per Icc/IL, IEEE-519) IEC 61000-4-30 Class A meter
Voltage Range ±5% perm, ±10% 20-min Continuous All levels
Flicker Pst ≤1 10-min P95 weekly
Flicker Plt <0.8 2-hour P95 weekly

The Math: 8,640 Readings

The CdR compliance calculation is deceptively simple: 5-minute intervals, 24 hours, 30 days. Here is how it works.

8,640
readings/month
5 min x 24h x 30d
95%
compliance threshold
minimum passing rate
432
max violations
5% of 8,640
5 min
measurement interval
CdR standard interval
Why 5 minutes matters

The CdR requires one reading every 5 minutes. Wertek reads every 5 minutes by default — perfect alignment with the standard. You get exactly 8,640 data points per month per parameter, which is the exact dataset the CRE expects for compliance verification.

Power Factor Deep Dive

Power factor is the most scrutinized parameter in the Codigo de Red. The April 2026 change will catch many plants off guard.

Before April 2026
FP 0.95 - 1.0

Current requirement. 95% of 5-minute readings must be within range. Most industrial plants pass this with basic capacitor banks.

After April 2026
FP 0.97 - 1.0

New requirement. The window shrinks significantly. Plants operating at 0.95-0.96 will fail compliance immediately. VFD-heavy plants are especially at risk.

CdR measures power factor every 5 minutes — not monthly average

This is a critical distinction. CFE bills report a monthly average power factor, which hides intra-day dips. The CdR evaluates each individual 5-minute reading. A plant averaging 0.98 but dipping to 0.94 during motor starts will accumulate violations that the CFE bill never shows.

Mexico Utility Power Factor Penalty (CFE)

CFE applies automatic surcharges or bonifications on every commercial and industrial electricity bill based on the measured power factor. This applies to ALL tariffs with demand meters — no minimum load threshold.

Surcharge (when PF < 0.90)
% Surcharge = (3/5) × ((90 / PF) - 1) × 100
Maximum surcharge: 120% of billing amount
Bonification (when PF ≥ 0.90)
% Bonification = (1/4) × (1 - (90 / PF)) × 100
Maximum bonification: 2.5% of billing amount

Example impact on a $50,000 MXN monthly electricity bill:

Power Factor Surcharge / Bonif. Impact on $50,000 MXN bill
0.70 +17.1% +$8,571
0.80 +7.5% +$3,750
0.85 +3.5% +$1,765
0.90 0% $0
0.95 -1.3% (bonif.) -$658
1.00 -2.5% (bonif.) -$1,250
CFE penalty is separate from Codigo de Red

The CFE tariff surcharge applies to ALL commercial/industrial users regardless of load size. The Codigo de Red (PF 0.97) applies only to loads >= 1 MW. A small factory with PF 0.75 won't violate CdR, but will pay 12.9% extra on every electricity bill.

International Comparison — 17 Countries

How does Mexico's Grid Code compare globally? The table below covers power factor, THD, and voltage unbalance limits across 17 countries grouped by region.

Country Standard PF Min THD-V (MV) V Unbal Freq Freq Tol
Americas (60 Hz)
Mexico CRE / CdR 0.97 6.5% 2% 60 Hz ±0.5 Hz
USA IEEE 519 0.85-0.95* 5% 3% 60 Hz ±0.5 Hz
Brazil PRODIST Mod.8 0.92 8% 2-3% 60 Hz ±0.5 Hz
Colombia CREG 024/025 0.90 5% 2-3% 60 Hz ±0.5 Hz
Chile NTSyCS 0.93 8% 2% 50 Hz ±0.5 Hz
Peru NTCSE 0.96 6% 2% 60 Hz ±0.5 Hz
Argentina ENRE 527/96 0.95 6% 2% 50 Hz ±0.5 Hz
Canada CSA / IEEE 0.90 5% 3% 60 Hz ±0.5 Hz
Europe (50 Hz)
EU EN 50160 — 8% 2% 50 Hz ±1%
Germany VDE-AR-N 4100 0.90 8% 2% 50 Hz ±1%
Spain RD 1955/2000 0.90 8% 2% 50 Hz ±1%
UK G5/5 (ENA) 0.95 4.5% 1.3% 50 Hz ±1%
Asia-Pacific & Middle East
India CEA Grid Std 0.90-0.95 5% 2-3% 50 Hz ±0.5 Hz
Saudi Arabia SAGC / SERA 0.90 5% 2% 60 Hz ±0.5 Hz
Japan JEAC 0.85 5% 2-3% 50/60 Hz ±0.2 Hz
South Africa NRS 048 0.90 8% 2% 50 Hz ±0.5 Hz
Australia AS/NZS 61000 0.90 6.5% 2-3% 50 Hz ±0.5 Hz

* USA: No federal PF mandate; 0.85-0.95 typical in utility tariffs. EU: EN 50160 is a utility obligation, not a consumer PF requirement. Color coding: red = strictest, orange = moderate, green = most relaxed.

When Does This Apply to Your Plant?

Grid code compliance is not universal — each country defines different thresholds for when regulations become mandatory. The table below shows when power quality rules apply to industrial consumers.

Country Rule Applies To
Mexico (CdR) ≥ 1 MW, MT/AT (own substation) Full CdR compliance (PF 0.97, THD, etc.)
Mexico (CFE PF) ALL commercial/industrial (any tariff) PF surcharge/bonification on bill
Brazil ALL Group A (> 2.3 kV) Virtually every factory
Peru ALL consumers PF 0.96, compensation mechanism
USA Utility-specific, no federal mandate Varies by interconnection agreement
EU (EN 50160) Utility obligation, not consumer Utility must deliver within limits
Germany ≥ 135 kW on MV (since April 2019) VDE-AR-N 4110 requirements
UK ANY new connection with harmonic loads G5/5 assessment required
India Varies by state (typically ≥ 33 kV) State-specific PF surcharges

Not sure if your plant needs to comply? Ask us — we'll help you determine which regulations apply to your specific situation.

Contact Us

How Wertek Monitors Grid Code

Purpose-built for Codigo de Red compliance, not retrofitted.

⏱

5-Minute Readings

Matches the CdR measurement interval exactly. 8,640 readings per month per parameter, ready for CRE audit.

⚠

Automatic Alerts

Get notified before you exceed the 5% violation threshold. Real-time alerts for power factor dips, THD spikes, and voltage unbalance.

📄

Compliance Reports

PDF reports with the 95% compliance calculation already done. Show auditors exactly where you stand, parameter by parameter.

Most plants are not actually compliant — they just don't know it.

Start Monitoring

Connect your meters and see your Grid Code compliance in real time. 5-minute readings from day one.

Start Now

View Compatible Meters

15 meters from 10 brands. Check if your existing meter is already supported.

Compatibility

Talk to an Engineer

Questions about Grid Code compliance or power quality monitoring?

Contact Us